IHS Inc., Home - http://www.ihs.com

IEC 60953-2 Rules for steam turbine thermal acceptance Tests Part 2: Method B - Wide range of accuracy for various types and sizes of turbines


Purchase Information
Use this form to request purchase information on IEC online subscriptions.
IEC Collections
First Name:

Last Name:

Email address:

Document IEC 60953-2 is offered by IHS as part of an online subscription. This subscription contains many documents on the same topic.

You may also purchase this document alone from the IHS Standards Store.


IEC 60953-2 Document Information:

Title
Rules for steam turbine thermal acceptance Tests Part 2: Method B - Wide range of accuracy for various types and sizes of turbines

Regles pour les essais thermiques de reception des turbines a vapeur - Deuxieme partie: Methode B - Precision de divers degres pour multiples modeles et tailles de turbines

International Electrotechnical Commission

Publication Date:
Dec 1, 1990

Scope:

Scope and object

Scope

The rules given in this standard are applicable to thermal acceptance tests covering a wide range of accuracy on steam turbines of every type, rating and application. Only the relevant portion of these rules will apply to any individual case.

The rules provide for the testing of turbines. whether operating with either superheated or saturated steam. They include measurements and procedures required to determine specific enthalpy within the moisture region and describe precautions necessary to permit testing while respecting radiological safety rules in nuclear plants.

Uniform rules for the preparation. carrying out, evaluation, comparison with guarantee and calculation of measuring uncertainty of acceptance tests are defined in this standard. Details of the conditions under which the acceptance test shall take place are included.

Should any complex or special case arise which is not covered by these rules, appropriate agreement shall be reached by manufacturer and purchaser before the contract is signed.

Object

The purpose of the thermal acceptance tests of steam turbines and turbine plants described in this standard is to verify guarantees given by the manufacturer of the plant concerning:

a) turbine plant thermal efficiency or heat rate;

b) turbine thermodynamic efficiency or steam rate or power output at specified steam flow conditions;

c) main steam flow capacity and/or maximum power output.

The guarantees with their provisions shall be formulated completely and without contradictions (see 2.4). The acceptance tests may also include such measurements as are necessary for corrections according to the conditions of the guarantee and checking of the results.

About IHS
IHS (NYSE: IHS) is a leading global provider of critical technical information, decision-support tools and related services in a number of industries including aerospace and defense, automotive, construction, electronics, and energy. IHS serves customers ranging from large governments and multinational corporations to smaller companies and technical professionals in more than 100 countries. IHS been in business for more than 45 years and employ more than 2,300 people around the world.

 

Legal Statement | Site Map | Privacy Policy | Standards Store

Redirector